Checklist for Using A New Diesel-powered Product for The First Time

Views: 45     Author: Site Editor     Publish Time: 2025-11-20      Origin: Site

Inquire

facebook sharing button
twitter sharing button
wechat sharing button
linkedin sharing button
whatsapp sharing button
sharethis sharing button

Pre-Operation & Inspection:


1. Read Manual: Thoroughly read and understand the operator's manual.

2. Visual Inspection: Check for any shipping damage, loose parts, or fluid leaks.

3. Fluid Levels: Add and Confirm all fluids are at the correct level (engine oil, coolant if liquid-cooled, fuel).

4. Battery: Connect the battery, ensure terminals are tight and clean.


Initial Start-up & Break-in:

5.  Bleed Fuel System: Purge air from the fuel system by following the manual's procedure.

6.  Initial Start: Start the unit and let it run at a moderate speed without load.

7.  Check for Leaks: Listen for unusual noises and re-check for any fuel or oil leaks.

8.  Gradual Break-in: For the first several hours, avoid maximum load to allow internal components to seat properly.


General Safety:

9. Ventilation: Always operate in a well-ventilated area to avoid fume inhalation.


Quick Links

Product Category

Domestic Company (Factory)

Add:  Yongkang Road 6, Chongchuan District, Nantong City, Jiangsu Province, China
Tel:  +86-513-89062880
Email:  info@siwei-power.com

German Subsidiary

Add: Hammerstr.19,40219 Duesseldorf,Germany
Tel: +49-157-32399960 (WhatsApp)
Email: info@siweipower.de

Copyright © 2024 Nantong Siwei Power Machinery Technology Co.,Ltd. All rights reserved.  Sitemap  Support by leadong.com  Privacy Policy